一、Performance and price comparison of plastic building formwork and other formwork

Property

Plastic formwork

Bamboo glue formwork

Wooden formwork

Steel formwork

Fire

Resistance

B2 grade flame retardant

Not flame retardant

Not flame retardant

Flame retardant

Recyclability

100% recycling

Non-recyclable

Non-recyclable

Low recycling rate

Water deformation resistance

100% waterproof

Absorb easy deformation

Absorb easy deformation

Rusting and deformation

Impact resistance

High strength

Low strength

Low strength

High strength

Toughness

Good

Poor

Poor

Poor

Demoulding process

Easy

Moderate

Moderate

Harder

Construction operation

Easy

General

Easy

Bulky

Release agent

No

Need

Need

Need

Wall effect after construction

Very smooth

Not smooth

(requires a second plastering )

Not smooth

(requires a second plastering )

Not smooth

(requires a second plastering )

Customer size

Yes

No

No

No

Corrosion resistance acid and alkali resistance

excellent

poor

poor

poor

Price(¥/pcs)

150

100

60

450

Recycling Price(¥/pcs)

35

0

0

100

Actual cost(¥/pcs)

115

100

60

350

Reusable times

≥30

15

6-8

≥40

Cost per apportionment

3.83

6.6

8.57

8.7



二、Specification for the use of plastic formwork

1. Scope of use :

Plastic formwork is very suitable for horizontal formwork of high-rise buildings, shear walls, vertical wall panels, dams, tunnels and bridge formwork, etc.

2.Sawing templates :

The plastic template is suitable for any saw blade, handsaw, chainsaw, etc. It can be cut by chainsaw into any irregular geometric shape without any burr.

3. Formwork laying standards:

The square timber that fits closely to the formwork should be laid lengthways. Board joints as small as possible, between the board and the board to be flat. Board joints with self-adhesive tape.

a.Top mould:

Firstly, lay wood square on scaffolding horizontally with a spacing of about 1.2m, then lay wood square  with a spacing of not more than 200-300mm, when the thickness of the pouring exceeds 200mm, the spacing should be adjusted appropriately.

 b.Wall mould:

longitudinally lay square wood after the formwork, the spacing is 150-200mm. in the horizontal lay two square wood links, leave good through the wall screw position, set up good diagonal bracing, transversal available steel flute connection composition type large wall mold, can be directly lifted, also can be removed and replaced single piece of formwork.

c.Beam, column mould:

cut out the template according to the size, the top stay through the wall bolt position, column mold available scaffolding four side locking, set up a good diagonal brace.


 _20220616143644

 

 

Please do contact us freely if you have any questions.
Email:export09@pvcmaker.com

Mobile phone:8615628820988(Wechat/WhatsApp)