一、Performance and price comparison of plastic building formwork and other formwork
Property | Plastic formwork | Bamboo glue formwork | Wooden formwork | Steel formwork |
Fire Resistance | B2 grade flame retardant | Not flame retardant | Not flame retardant | Flame retardant |
Recyclability | 100% recycling | Non-recyclable | Non-recyclable | Low recycling rate |
Water deformation resistance | 100% waterproof | Absorb easy deformation | Absorb easy deformation | Rusting and deformation |
Impact resistance | High strength | Low strength | Low strength | High strength |
Toughness | Good | Poor | Poor | Poor |
Demoulding process | Easy | Moderate | Moderate | Harder |
Construction operation | Easy | General | Easy | Bulky |
Release agent | No | Need | Need | Need |
Wall effect after construction | Very smooth | Not smooth (requires a second plastering ) | Not smooth (requires a second plastering ) | Not smooth (requires a second plastering ) |
Customer size | Yes | No | No | No |
Corrosion resistance acid and alkali resistance | excellent | poor | poor | poor |
Price(¥/pcs) | 150 | 100 | 60 | 450 |
Recycling Price(¥/pcs) | 35 | 0 | 0 | 100 |
Actual cost(¥/pcs) | 115 | 100 | 60 | 350 |
Reusable times | ≥30 | 15 | 6-8 | ≥40 |
Cost per apportionment | 3.83 | 6.6 | 8.57 | 8.7 |
二、Specification for the use of plastic formwork
1. Scope of use :
Plastic formwork is very suitable for horizontal formwork of high-rise buildings, shear walls, vertical wall panels, dams, tunnels and bridge formwork, etc.
2.Sawing templates :
The plastic template is suitable for any saw blade, handsaw, chainsaw, etc. It can be cut by chainsaw into any irregular geometric shape without any burr.
3. Formwork laying standards:
The square timber that fits closely to the formwork should be laid lengthways. Board joints as small as possible, between the board and the board to be flat. Board joints with self-adhesive tape.
a.Top mould:
Firstly, lay wood square on scaffolding horizontally with a spacing of about 1.2m, then lay wood square with a spacing of not more than 200-300mm, when the thickness of the pouring exceeds 200mm, the spacing should be adjusted appropriately.
b.Wall mould:
longitudinally lay square wood after the formwork, the spacing is 150-200mm. in the horizontal lay two square wood links, leave good through the wall screw position, set up good diagonal bracing, transversal available steel flute connection composition type large wall mold, can be directly lifted, also can be removed and replaced single piece of formwork.
c.Beam, column mould:
cut out the template according to the size, the top stay through the wall bolt position, column mold available scaffolding four side locking, set up a good diagonal brace.