Introduction of PP hollow building formwork:
lace of Origin: Shandong, China
Brand Name: GP
Model Number: Architectural template
Product name: 15mm building formwork board
Application: Building Construction
Type: Waterproof Plastic Template
Size:Customized
Reusable Times:60-100 Times
Usage:Outdoor
Advantage:Safty
Feature:Saving Cost



Features:
1. Cost saving. The recycling times of plastic hollow formwork is more than 50 times.
2. Energy saving and Eco friendly. The PP Plastic Concrete Formwork hasharmless to people, and can be reprocessed and regenerated after the formwork recycled.
3. Smooth surface. pp building formwork effect exceeds the technical requirements of the clear water formwork, eliminating the second plastering,PP Hollow Plastic Formwork Concrete Construction.
4.Keeping the weather stable. Anti-aging, acid and alkali resistance, corrosion resistance and low expansion coefficient of new building formwork. Moule en béton creux en plastique.
5. Excellent performance. The new building formwork has the advantages of high strength, good toughness, non-cracking, non-stratification

Features of hollow formwork board:
1. Easy to install. Lightweight, easy to install, each weight 12-14 KG, only half of the wood template, workers save time and labor.
2. High price recovery. After the template is scrapped, our company recovers it at a high price
3. Easy to store. Moule en béton creux en plastique is cold-resistant, high temperature-resistant and moth-proof, and needs no special treatment for storage.
4. Delamination is simple. No brush stripping agent is needed for film stripping, so it is easy to strip.10. High variability.
5.Template can be cut, cut and drilled arbitrarily.

Hollow building formwork, Plywood and Steel Formwork:
| Types | pp building formwork board | Plywood Formwork | Steel Formwork |
| Recycled Using | 50% | No | 15% |
| Water proof | Yes | No | Easy to get rusty |
| Deformation Degree | No | Yes | Yes |
| Demoulding | Easy | Hard | Easy |
| Size | OEM | Stable | Restricted |
| Anti-Corrosion | Excellent | Moderate | Bad |
| Recycling Times | 50+ | 5-10 | 60+ |
Delivery:
Delivery time: 10-30 days since receipt of PO and down payment.
Freight Sea: transportation (FCL & LCL)
Special Size: We provide cutting services for special sizes
Packing:
1. Naked or bulk packing.

2.Pallet packing.

3.Bulk and pallet packing mixed.

FAQ:
1.Are you a factory or trading company?
We are professional manufacturer, and the production capability 20000tons per year.
2.How can I get the sample?
We are pleased to offer you free samples. New clients are expected to pay for the delivery cost, this charge will be deducted from the payment for formal order.
3, What payment terms do you do?
30% T/T as down payment, the balance paid by T/T before shipment or 100% irrevocable L/C At sight.
4,What is your MOQ for building plastic template?
MOQ:200 PCS.
Hot Tags: pp hollow board for building formwork, China, manufacturers, suppliers, wholesale








