Ensure that the joints of the building formwork do not leak slurry: When using the building formwork, ensuring the high-quality pouring of the concrete is the main purpose. The joints of the building formwork should be guaranteed not to leak, otherwise it will cause the honeycomb surface of the concrete appearance, which will directly affect the quality of concrete pouring. Leave a gap for expansion.

2. There is no residue inside the building formwork: After the building formwork is installed, water it and moisten it, but there should be no water accumulation in the building formwork. There should also be no residue inside the building formwork, which will cause defects such as slag inclusions in the concrete and affect the pouring quality.

3. Requirements for applying release agent on building templates: building templates should be painted with release agent, and the choice of release agent should be appropriate, and the other building requirements that do not affect the project should be the standard. Reinforcement, otherwise it will affect the adhesion of the reinforcement to the concrete or cause the corrosion of the reinforcement.

4. Ensure the bearing capacity of the ground of the support: When performing multi-stage pouring, the load-bearing capacity of the ground of the lower support should be guaranteed. If a support is installed, it should be ensured that the upper and lower support columns are aligned, and pads should be prevented below the support. If there are reserved holes, the reserved building formwork should be fixed on the building formwork before pouring. Ensure the size and location of the reserved holes, etc.
While ensuring the quality of the project, combined with some daily maintenance work of the formwork can effectively increase the service life of the formwork, such as cleaning the cement residue on the formwork after the formwork is removed, and storing the formwork to avoid exposure, etc.