The production process of building formwork

Dec 15, 2022 Leave a message

1. Raw material cutting: The raw material is obtained by cutting layers of logs. The logs are cut and rotary cut on a horizontal plane according to a certain layer thickness, and cut into wood layers with the same ratio according to the size of the template, and the wood layers are The magazines on the surface should be removed, and the magazines can affect the bonding fastness of the late glue.

2. Drying and drying treatment: the wood layer after cutting and rotary cutting contains relatively large moisture. Therefore, for large-scale production, we need to use a wood dryer for drying treatment. The dried wood layer is relatively brittle , Therefore, it should be placed naturally for 2-3 days to ensure the toughness of the wood layer. In a small number of cases, we can use the sun for drying.

3. Gluing and layering treatment: A formed building formwork is glued together by multi-layer wood panels, and a special glue rolling machine is installed to pass the wooden panels through the glue filling machine. , the front and back of the board will be evenly coated with glue layer, and the wooden board coated with glue layer will be placed on the surface of the formwork evenly, and evenly spread 6-10 layers (according to the needs).

4. Hot pressing forming treatment: After the template layer is glued and laid, it is flattened by hot pressing process. In the traditional heating, boiler water is used for heating. The modern equipment room adopts electric heating. After flattening, the compactness of the building formwork can be increased, and the forming is relatively regular, which improves the use quality of the formwork. The process of pre-pressing and then hot-pressing is adopted to minimize the probability of slab dislocation, and then hot-pressed with reasonable pressure and temperature to ensure that each Chinese building formwork has excellent bonding strength and hardness.

5. Paint spraying, edge trimming and packaging treatment: After hot-pressing the building formwork, there will be a little misalignment and irregular corners of the inner wood boards. Use a carving knife to cut the excess boards and spray anti-corrosion paint to prevent corrosion Paint is an important factor to ensure the service life and storage time of building formwork. The building formwork has the advantages of light weight, high gravity, convenient use of bottles, smooth surface, and anti-corrosion.


66