Company Introduction
Shandong Green Plastic Co., Ltd, covering an area of more than 10,000 square meters, it is located in North Jinan City, Shandong Province. It is a manufacturer specializing in the production of plastic building construction formwork, plastic sheets, and clapboards. At present, it has 10 production lines, more than 100 excellent employees and more than 20 professional quality management personnel, with an annual output value of more than 100 million yuan. Products are widely used in construction, decoration, advertising and other fields, positioning the market and focusing on the future, which not only meets the market price demand, but also meets the requirements of the era of replacing wood with plastic, and at the same time, its recyclability meets today's increasingly severe environmental protection needs. In-depth market research, strong research and development capabilities, rich production experience and professional packaging and transportation services have won praise from customers at home and abroad for the company. At present, the company's products have been exported to more than 60 countries and used in more than 1,800 construction sites. We uphold the principle of quality first and integrity-based, and welcome your inquiries.

Features:
1. The hollow building formwork is easy to support and disassemble
This kind of hollow building formwork is very easy to set up and remove the formwork. It is connected by buckles, and the operation is simple and quick; the surface of the formwork is smooth, it can be automatically demoulded, no cleaning and maintenance is required, and no release agent is required. The surface of the formwork after use does not stick to cement, and the formwork does not need to be cleaned; Comparable steel formwork is 40% higher; compared with bamboo and wood formwork, construction efficiency can be increased by 40%.
2. The assembly time of hollow building formwork is short
Under the same conditions, the horizontal formwork is laid for every 1000m2 building area, that is to say, the hollow energy-saving building formwork is about 40% less time-consuming than the traditional formwork for the same building area.

3. The disassembly and assembly time of hollow building formwork is short
The thermal expansion coefficient of the hollow energy-saving building formwork is far different from that of concrete. After pouring, the formwork will automatically separate from the poured concrete as the temperature changes and the concrete solidifies.
4. The hollow building formwork is convenient and safe to carry
The density of this kind of hollow building formwork is 0.4 g/cubic centimeter, which is only 1/21 of that of steel. It is light in weight, and a worker can easily hold a formwork of 900 mm × 1800 mm in each hand, which is very convenient to carry. The template will not deform or absorb water during use, which can greatly improve the construction safety, and its damage rate is less than 1‰.


Packing:
1. Loose Packing and Container Loading Numbers:

| Size | Thickness | Wight: KGS/PC | Qty./20GP | Qty./40HQ |
| 2440*1220mm | 12mm=1/2'' | 22.3KGS | 735 PCS | 1255 PCS |
| 2440*1220mm | 15mm=5/8'' | 24.1KGS | 588 PCS | 1162 PCS |
| 2440*1220mm | 18mm=3/4'' | 28.3KGS | 490 PCS | 990 PCS |
2. Pallet Packing and Container Loading Numbers:
| Size | Thickness | Weight/PC | Qty./20GP | Qty./40HQ |
| 2440*1220mm | 12mm=1/2'' | 22.3 KGS | 584PCS/8Pallets | 1224PCS/16Pallets |
| 2440*1220mm | 15mm=5/8'' | 24.1 KGS | 468PCS/8Pallets | 984PCS/16Pallets |
| 2440*1220mm | 18mm=3/4'' | 28.3 KGS | 392PCS/8Pallets | 816PCS/16Pallets |
Specifications:
1.Shore hardness: 70 D
2.Simply supported beam unnotched impact strength: 33.7 KJ/m^2
3.Dimensional change rate after heating: horizontal 0.1%, longitudinal 0.1%.
4.Nail holding power: 741 N
5.Using times: 60 times on average
6.Tensile Strength:≥25Mpa
7.Impact Strength:≥30KJ/M2
8.Bending Strength:≥30Mpa
9.Flexural Modulus:≥3000Mpa
10.Water absorbtion: <=0.3%
11.Size: 2440*1220mm 1830*915mm, 8*4ft, 6*3ft
12.Thickness: 12 15 18mm are the common thickness

Precautions for using:
1.Roof or slab: The spacing between mold ribs should not exceed 20-25cm.
2.Column & Shear wall: The spacing between mold ribs should not exceed 10*15cm.
3.Shear wall: horizontal screw spacing <=50cm, vertical screw spacing <=45cm.
4.When nail the formwork, the spacing between the edge and nailing point is 15cm to 30cm. 5.The height of the nail usually in 40-50mm.

Sample policy:
1.Sample size: 150*100mm, sample free, shipping fees need to be prepaid or using buyer’s ecpress account for arrival pay. Usually 68 USD for 1-2 Pieces.
2.Sample size: if bigger than 150*100mm, sample will be charged according to the size and shipping fees also accrodingly.
3.After the buyer place the formal order, we will refund the sample fees or deduct from the order value.

Roof plastic formwork support: The distance between the sub-corrugations is determined according to the thickness of the plate. Under normal construction conditions, the distance between the sub-corrugations (center distance) for floors less than 150 thick is 350 to 400 mm; the distance between sub corrugations for floors with a thickness of 150 to 250 (center distance) is 300 mm . Compared with the normal use of bamboo plywood formwork, the spacing of the secondary corrugations is increased by 50mm, and the flatness deviation of the concrete surface is smaller, which truly achieves the effect of fair-faced concrete.

Shear wall plastic formwork support: Take the wall height of 2800 and the wall thickness of 300 as an example, using a 12mm formwork, the vertical secondary rib spacing (center distance) is 250mm; using a 15mm formwork, the vertical secondary corrugation spacing (center distance) is 300mm . Compared with the normal use of bamboo plywood formwork, the spacing of the second corrugations and the flatness deviation of the concrete surface are basically the same, but the concrete surface is smooth and clean, achieving the effect of fair-faced concrete, and the appearance quality is better. The plastic formwork of the same thickness, in a certain unit and under a certain load, has less deformation and greater rigidity, and the surface flatness after concrete pouring and formwork removal is better than that of bamboo plywood formwork. Under the action of large load, such as shear wall formwork, the formwork bearing capacity is large, and it is necessary to reduce the spacing of the secondary corrugations or increase the thickness of the plastic formwork, which can meet the construction technical requirements of the formwork when the concrete lateral pressure is large.


Hot Tags: plywood-like plastic concrete forms, China, manufacturers, suppliers, wholesale