Concrete slab formwork scaffolding:
Plastic building formwork is an energy-saving and environmentally friendly product. It is another new generation product after wood formwork, combined steel formwork, bamboo-wood glued formwork, and all-steel large formwork. It can completely replace the traditional steel formwork, wooden formwork and square timber, energy saving and environmental protection, and low amortization cost.

Information of concrete slab formwork scaffolding system:
Name: plastic building formwork
It is energy-saving and environmentally friendly, with low amortization cost.
Classification: PVC Foam struction.
Reuse times: more than 30 turnovers.
Green and environmentally friendly products.
Container loding of concrete slab formwork:
| Size | Weight | Qty./20GP | Qty./40HQ |
| 8*4ft*12mm | 25-26 KGS | 700 PCS | 1120 PCS |
| 8*4ft*15mm | 31-32 KGS | 560 PCS | 888 PCS |
| 8*4ft*18mm | 37-38 KGS | 466 PCS | 746 PCS |
| Concrete slab formwork scaffolding system | |||
Difference between other formwork:

Advantages:
The plastic building template adopts imported polypropylene resin as the base material, adopts a formula, and adds chemical additives such as toughening, reinforcement, weather resistance, anti-aging, flame retardant, etc., with high strength and small deformation, suitable for use under various conditions.
1. Light weight
Lighter, easier to handle and release heavy labor, manual operation reduces labor costs by 20%.
2. The surface does not need maintenance
High-pressure water jets rinse the surface of the plastic template, but the metal template requires surface maintenance.
3. Strong machinability
You can use saws, nails, drills, cutting, etc. to fit well, and is compatible with wood, steel, aluminum and other materials.

Prperty: Take a shear wall as a saple
Shear wall plastic formwork support: Take the wall height of 2800 and the wall thickness of 300 as an example, using 12mm formwork, the vertical secondary rib spacing (center distance) is 250mm; using 15mm formwork, the vertical secondary rib spacing (center distance) is 300mm . Compared with the normal use of bamboo plywood formwork, the spacing of the secondary corrugation and the deviation of the flatness of the concrete surface are basically the same, but the concrete surface is smooth and clean, achieving the effect of fair-faced concrete, and the look and feel is better.

Packing and Shipping:
1. Bulk Packing:
![]()

2. Pallet Packing

Shipping and payment terms:
Qingdao port is the main port.
TT 30% deposit and balance 70% TT before shopping.
Hot Tags: concrete slab formwork scaffolding system, China, manufacturers, suppliers, wholesale










