Retain Wall Formwork

Retain Wall Formwork

Name:Retain Wall Formwork
Size: 2440*1220MM
Thickness:12MM 15MM 18MM 20MM 27MM 29MM
Color: Blue
Surface: Hard & Glossy and smooth
Send Inquiry
Description
Technical Parameters

                                                          Retain Wall Formwork

Product info.:

PVC building formwork is made of PVC resin powder and other additives. Its main advantages are long service cycle and high turnover. Its function and purpose are exactly the same as traditional plywood. Can be used in place of or in addition to plywood. Mainly used in high-rise buildings, shear walls, vertical wall panels and dams, tunnels, overpasses, arch bridges and other bridges, beams and columns and other buildings formwork


retain wall formwork

Product Features:

1. Light weight: more suitable for high-rise buildings and bridge construction.

2. Large format: the maximum format is 2440×1220mm, which reduces the number of seams and improves the working efficiency of mold support.

3. No warping, no deformation, no cracking, good water resistance, high turnover and long service life.

4. Easy to demould, only 1/7 of the steel mold.

5. Make fair-faced concrete: the surface of the poured object is smooth and beautiful, minus the secondary plastering process of the wall, it can be directly veneered for decoration, reducing the construction period by 30%.

6. Corrosion resistance: does not pollute the concrete surface.

7. Good thermal insulation performance, which is conducive to winter construction.

8. Good construction performance. The performance of nailing, sawing and drilling is better than that of bamboo plywood and small steel plates. It can be processed into various shapes of templates according to construction needs.

1. Light weight: more suitable for high-rise buildings and bridge construction. 2. Large format: the maximum format is 2440×1220mm, which reduces the number of seams and improves the working efficiency of mold support. 3. No warping, no deformation, no cracking, good water resistance, high turnover and long service life. 4. Easy to demould, only 1/7 of the steel mold. 5. Make fair-faced concrete: the surface of the poured object is smooth and beautiful, minus the secondary plastering process of the wall, it can be directly veneered for decoration, reducing the construction period by 30%. 6. Corrosion resistance: does not pollute the concrete surface. 7. Good thermal insulation performance, which is conducive to winter construction. 8. It can be used as a template for a curved plane. 9. Good construction performance. The performance of nailing, sawing and drilling is better than that of bamboo plywood and small steel plates. It can be processed into various shapes of templates according to construction needs.


Use: 



1. Top formwork: First, lay the wooden squares horizontally on the scaffolding with a spacing of about 1.2m, and then lay the wooden squares vertically with a spacing of 0.4-0.6m; when the thickness of the poured plaster exceeds 200mm, the spacing should be appropriately adjusted.

2. Wall formwork: The formwork is firstly laid with three wooden squares vertically, and then two wooden squares are laid horizontally to connect, leaving the position of the screw through the wall and erecting the diagonal braces. It can be connected with steel corrugated horizontally to form a combined large wall formwork, or can be directly hoisted, which is easy to remove and replace a single formwork.

3. Beam and column formwork: Cut the formwork according to the size, and leave the position of the bolt through the wall.

retain wall formwork panel


Stock:


2440*1220*18mm 2440*1220*15mm stock available

pvc formwork -8



Construction Site:

Can use for wall, column, beam and foundation.


Packing and Shipping:

1. Pallet packing, maily for FLC shipping, means full of a container.


2. Bulk packing, mainly for LCL shipping, means less than a container.

PVC Plastic Concrete Formworkconcrete slab formwork scaffolding system



Shipping and payment terms:

  1. Qingdao port is the main port. Tianjin, Shanghai also.

  2. TT 30% deposit and balance 70% TT before container loading.



Delivery or lead time:

5-7 days after deposit. Before loading ocntainer and balance payment

6


Hot Tags: retain wall formwork, China, manufacturers, suppliers, wholesale