The installation process must begin with the markup of the workspace. It is important that it coincides with the parameters of the previously constructed frame and fittings:
1. Installation is recommended to start with shields placed in the corners, which will allow the formation of certain beacons.
2. After that, the shuttering is assembled from the boards on one side, and all the details of the construction are important to fix with the use of locks.
3. Further, the installed panel is important to align, using special braces, and secure in the desired position in accordance with the project documentation.
4. Having determined the thickness of the pouring of the concrete wall, it is necessary to install the next wall of the formwork with the same technology.
5. In the upper part of the formwork it is important to mount the chassis console.
6. After the alignment of all the walls of the structure, you can proceed to further work on installing the column and pouring the base.