The important thing to say three times
We are a factory
We are a plastic concrete formwork supplier
We are a professional manufacturer of construction formwork


|
Product Name: |
H20 Plastic Beam for Formwork Systems |
|
Raw Material: |
PVC |
|
Specification: |
50x90mm, length can be customized |
|
Weight: |
1.7kg/m |
|
Product Performance: |
light weight, high strength, waterproof and Resistant, No absorption of moisture, no deformation, no mildew |
|
Reuse time: |
More than 150 reusable times |
|
Application: |
All building support systems |
|
Easy to operate: |
Sawing, drilling and nailing are all available. |
|
Operation Instruction: |
When nailing, the distance from H beam edge should be 15-30mm, the strength should be moderate, 40-50mm of the length of nails is better. |
|
Bear temperature |
-35℃~120℃ |

H20 Beam Advantages:
1. Light weight,high strength,high turnover,waterproof and corrosion resistant.
2. Surface is smooth,bright and clean; Casting molding effect is good.
3. No absorption of moisture,no deformation,no mildew,long-term immersion stratification in the water.
4. Easy to process. Sawing,drilling and nailing are all available.
5. Easy to remove. Removing is convenient,quick and safe.
6.Long service life can be recycle used for 100-150 times.
7.Open storage.

Comparision with other materials:
|
Performance comparison |
plastic H beam |
Common Wood |
Common square steel |
Common steel pipe |
|
Drop Test (10m) |
Not broken |
Broken |
Deformed |
Deformed |
|
Wear-resistance |
Good |
Poor |
Good |
Good |
|
After water absorption |
no absorption no deformation |
Deformed |
Rusty and deformed |
Rusty and deformed |
|
Nail |
Easy |
Easy |
Unworkable |
Unworkable |
|
Expansion shrinkage |
Small |
Smaller |
Smallest |
Smallest |
|
Residual value of scrap |
High |
non |
Low |
Low |
|
Periodic maintenance |
No need |
No need |
Need |
Need |
|
Reusable times |
150 times |
20-30 times |
80-100 times |
80-100 times |
H20 Plastic Beam Application

FAQ
Q: Are you a factory or trading company?
A: Factory of durable plastic formwork for concrete.
Q: How can I get the sample?
A:We provide sample free of charge 2 work days
Q: What payment terms do you do?
A: 30% T/T as down payment, the balance paid by T/T before shipment
or 100% irrevocable L/C At sight.
Q: Can we mix the plastic formwork together into the container?
A: Surely, we are factory of plastic formwork and plastic beam
Q: How long is your delivery time?
A: 7-15 work days
Q: How to pack the product?
A: On pallet and carton or as customers' requirement.
Hot Tags: construction building materials h20 plastic beam for formwork systems, China, manufacturers, suppliers, wholesale












